Questions and Answers

In the interest of promoting a fair and open bidding process, please do not call and ask your questions. All questions submitted by the deadline listed on the RFPs and their answers will be posted on this page.

We are replacing all the switches and APs that are more than a few years old. The following locations have recently replaced equipment that is not going to be replaced as part of this project.

access points at the Administration Building, Tech Office, Elementary Portables, ISS Building, WRRSSA Building and Bus Barn as well as any that fail and have to be replaced before this project is approved and installed

and 

switches at the Administration Building, Tech Office, Elementary Portables, ISS Building, WRRSSA Building and Bus Barn as well as any that fail and have to be replaced before this project is approved and installed

The APs in the High School Gym failed right around the time we filed our 470 so we will be replacing them outside of this E-Rate project. 

Question submitted by Cassie Bryant, IK Network Solutions

There must be at least one Layer 3 capable switch at each location.

Question submitted by Advanced Networks of Texas

As noted in the RFP, we are requesting at least 1 Gbps on all copper ethernet ports and at least 10Gbps on fiber links.

Question submitted by Advanced Networks of Texas

We are not specifying an exact model of switches or APs. The only requirement is that it meet the specifications in the RFP.

Question submitted by Advanced Networks of Texas

We would like the 5-year or longer licensing for all switches, APs, and other network equipment proposed.

Question submitted by Jackson Myers, United Systems

 

See the following from the RFP:

  • Replace currently deployed access points

  • Must support 25+ students per classroom

  • If proposing access points in locations where one does not already exist, include the cost of moving an existing cable run or pulling new cable back to the nearest network closet

We are asking for enough APs to service 25+ students per classroom. If that can be accomplished with the current number and layout of APs as noted on the building maps, there is no need for additional APs. If that can’t be accomplished with the current number and layout of APs, please include pulling cable to any new locations from the nearest network closet.

Please note, we are keeping some recently replaced switches and APs, see the RFP for details.

Question submitted by Jackson Myers, United Systems

It sounds like you’re describing a lit fiber WAN connection, which is not something we’re bidding at this time. Our WAN connection is already under contract until June 30, 2025.

Question submitted by Jaison Widmer, WANRack.